Fields / 1/2-U-3
1/2-U-3
Other, soil drillingPlugged
Drilled by ConocoPhillips Skandinavia AS with Bucentaur, 12.05.2009 to 12.05.2009 (0 days), to 107,0 m.
Water depth74,0 m
Total depth107,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud12.05.2009
Completed12.05.2009
OperatorConocoPhillips Skandinavia AS
Position56,9486 N, 2,4524 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.