Fields / 1/5-3 S
1/5-3 S
Exploration, wildcatPlugged and abandonedOil
Drilled by Conoco Norway Inc. with Byford Dolphin, 10.06.1998 to 06.08.1998 (57 days), to 1 565,0 m in the Hordaland Group.
Water depth69,0 m
Total depth1 565,0 m MD
Vertical depth1 565,0 m TVD
Bottom-hole temperature54 °C
Max inclination5,7°
Rotary table25,0 m
Formation at total depthHordaland Group
RigByford Dolphin
Spud10.06.1998
Completed06.08.1998
OperatorConoco Norway Inc.
Position56,6901 N, 2,6150 E
Formations
2 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 54 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 166,7 | 36" | 167,0 | - |
| Surface casing | 20" | 784,7 | 26" | 785,0 | 1,79 LOT |
| Intermediate | 13 3/8" | 1 412,0 | 17 1/2" | 1 412,0 | 1,98 LOT |
| Open hole | - | 1 565,0 | 12 1/4" | 1 565,0 | - |
Mud weight
19 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, barasilc, kcl/gem gp, kcl/pac/glycol.