Fields / 1/6-U-12
1/6-U-12
Other, soil drillingPlugged and abandoned
Drilled by ConocoPhillips Skandinavia AS with Horizon Geodiscovery, 17.04.2025 to 19.04.2025 (2 days), to 39,3 m.
Water depth71,4 m
Total depth39,3 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigHorizon Geodiscovery
Spud17.04.2025
Completed19.04.2025
OperatorConocoPhillips Skandinavia AS
Position56,5017 N, 2,9185 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.