WellplannerNorwegian shelf well data

Fields / Tommeliten A / 1/9-1

1/9-1

Exploration, wildcatPlugged and abandonedGas and condensate

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Tommeliten A, 14.10.1976 to 17.02.1977 (126 days), to 3 703,0 m in the Hidra Formation.

Water depth78,0 m
Total depth3 703,0 m MD
Vertical depth-
Bottom-hole temperature133 °C
Max inclination-
Rotary table25,0 m
Formation at total depthHidra Formation
RigRoss Rig (1)
Spud14.10.1976
Completed17.02.1977
OperatorDen norske stats oljeselskap a.s
Position56,4014 N, 2,9018 E

Formations

15 tops reported, measured depth in metres.

GroupsNordland Group, top 103,0 mNordland GpHordaland Group, top 1 572,0 mHordaland GpRogaland Group, top 2 872,0 mRogaland GpShetland Group, top 3 036,0 mShetland GpFormationsBalder Formation, top 2 872,0 mSele Formation, top 2 884,0 mLista Formation, top 2 944,0 mAndrew Formation, top 2 947,0 mLista Formation, top 2 952,0 mVåle Formation, top 3 013,0 mEkofisk Formation, top 3 036,0 mTor Formation, top 3 104,0 mTor FmHod Formation, top 3 312,0 mHod FmBlodøks Formation, top 3 648,0 mHidra Formation, top 3 662,0 m1031 0002 0003 0003 703

Temperature

Reported at total depth133 °C
Drill-stem test at 3 310,0 m120 °C
Tommeliten A gradient35,8 °C/km
Estimated at total depth from the gradient133 °C

The gradient is the median of 5 released wells in Tommeliten A with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
1/9-1 R same well0,03 704,0133 °C-1987
1/9-AB-6 H1,05 085,0--2023
1/9-AB-1 AH1,05 197,0--2023
1/9-AB-1 H1,03 981,0--2022
1/9-U-171,0---2020
1/9-AB-5 H1,05 114,0--2023
1/9-AB-2 H1,05 257,0--2023
1/9-AB-4 H1,05 686,4--2023

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"152,036"152,0-
Surface casing20"423,026"433,0-
Intermediate13 3/8"1 343,017 1/2"1 355,01,49 LOT
Intermediate9 5/8"2 825,012 1/4"2 836,0-
Liner7"3 369,08 1/2"3 706,0-

Mud weight

8 measurements, one dot each, 1,00 to 1,91 g/cm³ against measured depth, spud mud, waterbased.

1,01,21,41,61,82,001 0002 0003 000143,0 m: 1,04 g/cm³, spud mud432,0 m: 1,37 g/cm³, spud mud1 358,0 m: 1,46 g/cm³, spud mud1 960,0 m: 1,91 g/cm³, waterbased2 577,0 m: 1,84 g/cm³, waterbased2 836,0 m: 1,68 g/cm³, waterbased3 328,0 m: 1,66 g/cm³, waterbased3 683,0 m: 1,65 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
83 055,0 - 3 068,04,6-11690218 000
8.13 055,0 - 3 068,018,3-1111 007-
73 082,0 - 3 088,0-----
63 105,0 - 3 109,08,4-118127130 000
53 120,0 - 3 133,09,5-120460251 000
5.13 129,0 - 3 133,05,0-1219845 000
43 148,0 - 3 157,09,5-120420154 000
33 174,0 - 3 182,019,0-117--
23 210,0 - 3 220,019,0-116--
13 298,0 - 3 310,019,0-120--