Fields / Tommeliten Gamma / 1/9-A-3 H
1/9-A-3 H
Development, productionPlugged and abandonedGas
Drilled by Den norske stats oljeselskap a.s with Ross Isle in Tommeliten Gamma, 04.01.1987 to 11.02.1987 (38 days), to 3 329,0 m.
Water depth75,0 m
Total depth3 329,0 m MD
Vertical depth3 291,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigRoss Isle
Spud04.01.1987
Completed11.02.1987
OperatorDen norske stats oljeselskap a.s
Position56,4921 N, 2,9242 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tommeliten Gamma gradient | 39,3 °C/km |
| Estimated at total depth from the gradient | 130 °C |
The gradient is the median of 4 released wells in Tommeliten Gamma with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.