Fields / 1/9-U-30
1/9-U-30
Other, soil drillingPlugged and abandoned
Drilled by ConocoPhillips Skandinavia AS with Horizon Geodiscovery, 14.07.2025 to 17.07.2025 (3 days), to 41,5 m.
Water depth71,9 m
Total depth41,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigHorizon Geodiscovery
Spud14.07.2025
Completed17.07.2025
OperatorConocoPhillips Skandinavia AS
Position56,4950 N, 2,9180 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.