WellplannerNorwegian shelf well data

Fields / Frigg / 10/1-A-12

10/1-A-12

Development, productionPlugged and abandonedGas

Drilled by Elf Petroleum Norge AS with 10/1-cdp1 in Frigg, 03.06.1977 to 04.12.1977 (184 days), to 1 963,0 m.

Water depth96,0 m
Total depth1 963,0 m MD
Vertical depth1 926,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
Rig10/1-cdp1
Spud03.06.1977
Completed04.12.1977
OperatorElf Petroleum Norge AS
Position59,8752 N, 2,0614 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Frigg gradient23,0 °C/km
Estimated at total depth from the gradient45 °C

The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
10/1-A-100,02 124,0--1977
10/1-A-90,02 034,0--1977
10/1-A-110,02 170,0--1976
10/1-A-80,01 932,0--1977
10/1-A-70,02 089,0--1977
10/1-A-40,01 984,0--1977
10/1-A-50,02 124,0--1977
10/1-A-60,01 961,0--1977

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗