10/1-A-22
Development, productionPlugged and abandonedGas
Drilled by Elf Petroleum Norge AS with 10/1-cdp1 in Frigg, 22.01.1978 to 01.12.1978 (313 days), to 2 127,0 m.
Water depth96,0 m
Total depth2 127,0 m MD
Vertical depth1 922,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
Rig10/1-cdp1
Spud22.01.1978
Completed01.12.1978
OperatorElf Petroleum Norge AS
Position59,8752 N, 2,0618 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Frigg gradient | 23,0 °C/km |
| Estimated at total depth from the gradient | 45 °C |
The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.