Fields / 10/4-1
10/4-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Wintershall Norge AS with Borgland Dolphin, 20.06.2015 to 12.07.2015 (22 days), to 2 415,0 m in the Zechstein Group.
Water depth98,0 m
Total depth2 415,0 m MD
Vertical depth2 415,0 m TVD
Bottom-hole temperature-
Max inclination1,7°
Rotary table31,0 m
Formation at total depthZechstein Group
RigBorgland Dolphin
Spud20.06.2015
Completed12.07.2015
OperatorWintershall Norge AS
Position57,6750 N, 5,1552 E
Formations
25 tops reported, measured depth in metres.
Temperature
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 9/6-1 | 11,5 | 3 393,0 | - | - | 2025 |
| 9/6-U-1 | 11,5 | 725,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 195,4 | 36" | 202,0 | - |
| Pilot hole | - | 606,0 | 9 7/8" | 606,0 | - |
| Intermediate | 13 3/8" | 630,8 | 17 1/2" | 640,0 | - |
| - | - | 643,0 | - | 643,0 | 1,52 FIT |
| Intermediate | 9 5/8" | 1 991,1 | 12 1/4" | 2 004,0 | - |
| - | - | 2 007,0 | - | 2 007,0 | 1,93 LOT |
| Open hole | - | 2 415,0 | 8 1/2" | 2 415,0 | - |
Mud weight
10 measurements, one dot each, 1,00 to 1,49 g/cm³ against measured depth, displacement mud, hi vis sweeps, innovert, sea water.