Fields / 10/5-1
10/5-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Conoco Norway Inc. with Norjarl, 31.05.1976 to 26.06.1976 (26 days), to 1 843,0 m in the Basement.
Water depth98,0 m
Total depth1 843,0 m MD
Vertical depth-
Bottom-hole temperature52 °C
Max inclination0,8°
Rotary table24,0 m
Formation at total depthBasement
RigNorjarl
Spud31.05.1976
Completed26.06.1976
OperatorConoco Norway Inc.
Position57,5811 N, 5,5903 E
Formations
30 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 52 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 183,0 | 36" | 185,0 | - |
| Surface casing | 20" | 488,0 | 26" | 490,0 | - |
| Intermediate | 13 3/8" | 1 221,0 | 17 1/2" | 1 222,0 | - |
| Open hole | - | 1 843,0 | 12 1/4" | 1 843,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,37 g/cm³ against measured depth, spud mud, water based.