Fields / 11/5-1
11/5-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Petroleum AS with Polar Pioneer, 07.08.2007 to 12.09.2007 (36 days), to 1 950,0 m in the Basement.
Water depth176,0 m
Total depth1 950,0 m MD
Vertical depth1 935,0 m TVD
Bottom-hole temperature64 °C
Max inclination17,3°
Rotary table23,0 m
Formation at total depthBasement
RigPolar Pioneer
Spud07.08.2007
Completed12.09.2007
OperatorNorsk Hydro Petroleum AS
Position57,6130 N, 6,6072 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 64 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 263,0 | 36" | 267,0 | - |
| Surface casing | 20" | 410,0 | 26" | 415,0 | 1,58 LOT |
| Intermediate | 9 5/8" | 1 063,0 | 12 1/4" | 1 073,0 | 2,32 LOT |
| Open hole | - | 1 950,0 | 8 1/2" | 1 950,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,27 g/cm³ against measured depth, water based.