15/12-A-16
Development, injectionPlugged and abandonedWater
Drilled by Pertra AS (OLD) with Mærsk Giant in Varg, 29.03.2005 to 01.05.2005 (33 days), to 3 609,0 m.
Water depth84,0 m
Total depth3 609,0 m MD
Vertical depth3 223,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,5 m
Formation at total depth-
RigMærsk Giant
Spud29.03.2005
Completed01.05.2005
OperatorPertra AS (OLD)
Position58,0779 N, 1,8905 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Varg gradient | 42,4 °C/km |
| Estimated at total depth from the gradient | 135 °C |
The gradient is the median of 7 released wells in Varg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/12-14 | 0,0 | 3 305,0 | 130 °C | 1,55 | 2003 |
| 15/12-A-12 | 0,0 | 3 354,0 | - | - | 1999 |
| 15/12-A-12 A | 0,0 | 3 305,0 | - | - | 2003 |
| 15/12-A-12 B | 0,0 | 3 253,0 | - | - | 2006 |
| 15/12-A-12 C | 0,0 | 4 782,0 | - | - | 2011 |
| 15/12-A-12 D | 0,0 | 3 938,0 | - | - | 2011 |
| 15/12-A-12 E | 0,0 | 3 682,0 | - | - | 2013 |
| 15/12-A-15 | 0,0 | 4 460,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.