15/12-A-7
Development, productionPluggedOil
Drilled by Talisman Energy Norge AS with Mærsk Giant in Varg, 23.06.2005 to 16.07.2005 (23 days), to 3 157,0 m.
Water depth84,0 m
Total depth3 157,0 m MD
Vertical depth2 994,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,5 m
Formation at total depth-
RigMærsk Giant
Spud23.06.2005
Completed16.07.2005
OperatorTalisman Energy Norge AS
Position58,0779 N, 1,8905 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Varg gradient | 42,4 °C/km |
| Estimated at total depth from the gradient | 125 °C |
The gradient is the median of 7 released wells in Varg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/12-20 S | 0,0 | 4 192,0 | 123 °C | 1,60 | 2008 |
| 15/12-A-7 A same well | 0,0 | 4 192,0 | - | - | 2008 |
| 15/12-A-7 B same well | 0,0 | 4 933,0 | - | - | 2010 |
| 15/12-A-7 C same well | 0,0 | 4 065,0 | - | - | 2010 |
| 15/12-A-8 | 0,0 | 3 347,0 | - | - | 1998 |
| 15/12-A-8 A | 0,0 | 3 514,0 | - | - | 2008 |
| 15/12-A-6 | 0,0 | 5 338,0 | - | - | 1999 |
| 15/12-A-6 A | 0,0 | 4 295,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.