Fields / 15/12-U-15
15/12-U-15
Other, soil drillingPlugged and abandoned
Drilled by Talisman Energy Norge AS with Bucentaur, 20.09.2013 to 20.09.2013 (0 days), to 122,0 m.
Water depth85,0 m
Total depth122,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud20.09.2013
Completed20.09.2013
OperatorTalisman Energy Norge AS
Position58,1241 N, 1,9222 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/12-24 S | 0,0 | 3 181,0 | - | 1,47 | 2015 |
| 15/12-U-13 | 0,1 | 123,0 | - | - | 2013 |
| 15/12-U-14 | 0,1 | 121,0 | - | - | 2013 |
| 15/12-26 | 1,6 | 2 787,0 | - | 1,35 | 2021 |
| 15/12-2 | 2,0 | 2 924,0 | 81 °C | 1,41 | 1976 |
| 15/12-U-1 | 4,7 | - | - | - | 1994 |
| 15/12-U-2 | 4,7 | - | - | - | 1994 |
| 15/12-U-3 | 4,7 | - | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.