15/3-A-9
Development, productionClosedGas
Drilled by Statoil Petroleum AS with West Epsilon in Gudrun, 28.10.2011 to 08.03.2013 (497 days), to 5 706,0 m.
Water depth109,0 m
Total depth5 706,0 m MD
Vertical depth4 460,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table53,2 m
Formation at total depth-
RigWest Epsilon
Spud28.10.2011
Completed08.03.2013
OperatorStatoil Petroleum AS
Position58,8451 N, 1,7438 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gudrun gradient | 32,6 °C/km |
| Estimated at total depth from the gradient | 144 °C |
The gradient is the median of 4 released wells in Gudrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/3-A-10 | 0,0 | 5 730,0 | - | - | 2020 |
| 15/3-A-13 | 0,0 | 5 070,0 | - | - | 2011 |
| 15/3-A-5 | 0,0 | 5 919,0 | - | - | 2011 |
| 15/3-A-5 A | 0,0 | 4 851,0 | - | - | 2014 |
| 15/3-A-14 | 0,0 | 5 727,0 | - | - | 2015 |
| 15/3-A-6 | 0,0 | 5 976,0 | - | - | 2011 |
| 15/3-A-6 A | 0,0 | - | - | - | - |
| 15/3-A-11 | 0,0 | 4 390,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.