15/3-U-2
Other, soil drillingPlugged and abandoned
Drilled by StatoilHydro ASA with Bucentaur in Gudrun, 22.10.2008 to 23.10.2008 (1 days).
Water depth109,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud22.10.2008
Completed23.10.2008
OperatorStatoilHydro ASA
Position58,8456 N, 1,7439 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gudrun gradient | 32,6 °C/km |
The gradient is the median of 4 released wells in Gudrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.