WellplannerNorwegian shelf well data

Fields / Gudrun / 15/3-U-5

15/3-U-5

Other, soil drillingPlugged and abandoned

Drilled by StatoilHydro ASA with Bucentaur in Gudrun, 01.11.2008 to 02.11.2008 (1 days).

Water depth109,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud01.11.2008
Completed02.11.2008
OperatorStatoilHydro ASA
Position58,8445 N, 1,7446 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gudrun gradient32,6 °C/km

The gradient is the median of 4 released wells in Gudrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/3-U-30,1---2008
15/3-U-70,11 020,0--2010
15/3-A-150,16 022,0--2019
15/3-A-160,16 635,0--2011
15/3-A-140,15 727,0--2015
15/3-A-130,15 070,0--2011
15/3-A-110,14 390,0--2020
15/3-A-100,15 730,0--2020

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗