15/5-A-5 H
Development, productionPlugged and abandonedOil
Drilled by Statoil ASA (old) with Mærsk Innovator in Glitne, 21.07.2003 to 19.08.2003 (29 days), to 3 840,0 m.
Water depth111,5 m
Total depth3 840,0 m MD
Vertical depth2 189,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud21.07.2003
Completed19.08.2003
OperatorStatoil ASA (old)
Position58,7127 N, 1,6584 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Glitne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/6-A-1 H | 0,6 | 3 891,0 | - | - | 2000 |
| 15/6-A-3 H | 0,6 | 4 225,0 | - | - | 2000 |
| 15/6-A-2 AH | 0,6 | 3 866,0 | - | - | 2000 |
| 15/6-A-2 H | 0,6 | 2 589,0 | - | - | 2000 |
| 15/6-A-4 AH | 0,6 | 4 034,0 | - | - | 2001 |
| 15/6-A-4 H | 0,6 | 2 670,0 | - | - | 2001 |
| 15/5-5 | 1,0 | 2 645,0 | 90 °C | 1,25 | 1995 |
| 15/5-A-7 AH | 1,6 | 4 122,0 | - | - | 2012 |
Casing and formation tests
No casing programme is reported for this wellbore.