Fields / 15/6-13 A
15/6-13 A
Exploration, appraisalPlugged and abandonedDry
Drilled by Statoil Petroleum AS with Songa Trym, 30.05.2015 to 03.06.2015 (4 days), to 3 925,0 m in the Skagerrak Formation.
Water depth114,0 m
Total depth3 925,0 m MD
Vertical depth3 741,0 m TVD
Bottom-hole temperature-
Max inclination30,2°
Rotary table25,0 m
Formation at total depthSkagerrak Formation
RigSonga Trym
Spud30.05.2015
Completed03.06.2015
OperatorStatoil Petroleum AS
Position58,6154 N, 1,7613 E
Formations
33 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/6-13 same well | 0,0 | 3 577,0 | 118 °C | 1,62 | 2015 |
| 15/6-13 B same well | 0,0 | 3 773,0 | - | 1,53 | 2015 |
| 15/6-12 | 2,1 | 3 930,0 | 127 °C | 1,89 | 2010 |
| 15/6-4 | 2,8 | 3 505,0 | 99 °C | 1,16 | 1976 |
| 15/6-9 A | 3,3 | 3 690,0 | 119 °C | 1,48 | 2007 |
| 15/6-9 B | 3,3 | 4 010,0 | 125 °C | 1,48 | 2007 |
| 15/6-9 S | 3,3 | 3 940,0 | 125 °C | 1,46 | 2007 |
| 15/6-U-1 | 3,4 | 149,0 | - | - | 2006 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 188,0 | 36" | 189,0 | - |
| Surface casing | 20" | 1 026,0 | 26" | 1 033,5 | 1,39 FIT |
| - | - | 2 141,0 | - | 2 141,0 | 1,59 FIT |
| Liner | 9 5/8" | 3 449,0 | 12 1/4" | 3 450,0 | 1,75 FIT |
| Open hole | - | 3 925,0 | 8 1/2" | 3 925,0 | - |
Mud weight
10 measurements, one dot each, 1,30 to 1,58 g/cm³ against measured depth, ems 4400.