WellplannerNorwegian shelf well data

Fields / Glitne / 15/6-A-6 Y1H

15/6-A-6 Y1H

Development, productionPlugged and abandonedOil

Drilled by Statoil ASA (old) with DEEPSEA BERGEN decom in Glitne, 09.04.2004 to 19.05.2004 (40 days), to 4 513,0 m.

Water depth110,7 m
Total depth4 513,0 m MD
Vertical depth2 170,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud09.04.2004
Completed19.05.2004
OperatorStatoil ASA (old)
Position58,6941 N, 1,6737 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

2 released wells in Glitne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/6-A-6 Y2H same well0,04 520,0--2004
15/5-61,32 725,061 °C1,501997
15/6-A-4 AH2,14 034,0--2001
15/6-A-4 H2,12 670,0--2001
15/6-A-2 AH2,13 866,0--2000
15/6-A-2 H2,12 589,0--2000
15/6-A-3 H2,14 225,0--2000
15/6-A-1 H2,13 891,0--2000

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗