15/6-B-5
Development, observationPlugged
Drilled by Equinor Energy AS with Noble Lloyd Noble in Gina Krog, 18.05.2019 to 23.07.2023 (1527 days), to 5 645,0 m.
Water depth116,3 m
Total depth5 645,0 m MD
Vertical depth3 976,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,8 m
Formation at total depth-
RigNoble Lloyd Noble
Spud18.05.2019
Completed23.07.2023
OperatorEquinor Energy AS
Position58,5721 N, 1,6970 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gina Krog gradient | 32,3 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 8 released wells in Gina Krog with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/6-B-5 A same well | 0,0 | 6 770,0 | - | - | 2023 |
| 15/6-B-4 | 0,0 | 6 200,0 | - | - | 2018 |
| 15/6-B-9 | 0,0 | 4 132,0 | - | - | 2019 |
| 15/6-B-18 | 0,0 | 7 942,0 | - | - | 2015 |
| 15/6-B-3 | 0,0 | 7 167,0 | - | - | 2018 |
| 15/6-B-14 | 0,0 | 4 715,0 | - | - | 2016 |
| 15/6-B-14 A | 0,0 | 5 390,0 | - | - | 2018 |
| 15/6-B-8 | 0,0 | 4 463,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.