WellplannerNorwegian shelf well data

Fields / Sleipner Øst / 15/9-11

15/9-11

Exploration, appraisalPlugged and abandonedGas and condensate

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Sleipner Øst, 18.09.1981 to 23.12.1981 (96 days), to 2 950,0 m in the Smith Bank Formation.

Water depth88,0 m
Total depth2 950,0 m MD
Vertical depth-
Bottom-hole temperature107 °C
Max inclination2,2°
Rotary table25,0 m
Formation at total depthSmith Bank Formation
RigRoss Rig (1)
Spud18.09.1981
Completed23.12.1981
OperatorDen norske stats oljeselskap a.s
Position58,4007 N, 1,8949 E

Formations

23 tops reported, measured depth in metres.

GroupsNordland Group, top 113,0 mNordland GpHordaland Group, top 1 311,0 mHordaland GpRogaland Group, top 2 181,0 mRogaland GpShetland Group, top 2 530,0 mShetland GpCromer Knoll Group, top 2 705,0 mViking Group, top 2 752,0 mVestland Group, top 2 795,0 mVestland GpFormationsUtsira Formation, top 823,0 mUtsira FmBalder Formation, top 2 181,0 mBalder FmLista Formation, top 2 304,0 mHeimdal Formation, top 2 387,0 mHeimdal FmEkofisk Formation, top 2 530,0 mJorsalfare Formation, top 2 557,0 mKyrre Formation, top 2 624,0 mBlodøks Formation, top 2 674,0 mHidra Formation, top 2 700,0 mRødby Formation, top 2 705,0 mSola Formation, top 2 718,0 mÅsgard Formation, top 2 725,0 mDraupne Formation, top 2 752,0 mHeather Formation, top 2 766,0 mHugin Formation, top 2 795,0 mSmith Bank Formation, top 2 830,0 mSmith Bank Fm1135001 0001 5002 0002 5002 950

Temperature

Reported at total depth107 °C
Sleipner Øst gradient27,4 °C/km
Estimated at total depth from the gradient82 °C

The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-D-1 H1,32 775,0--1993
15/9-D-3 H1,42 610,0--1993
15/9-U-112,1----
15/9-163,63 120,077 °C1,321982
15/9-U-123,6----
15/9-U-13,7---1989
15/9-U-23,7---1989
15/9-133,83 280,091 °C1,311982

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"174,036"175,0-
Surface casing20"569,026"585,01,54 LOT
Intermediate13 3/8"1 159,017 1/2"1 176,01,77 LOT
Intermediate9 5/8"2 575,012 1/4"2 590,01,85 LOT
Liner7"2 950,08 1/2"2 950,0-

Mud weight

5 measurements, one dot each, 1,10 to 1,23 g/cm³ against measured depth, waterbased.

1,11,21,305001 0001 5002 0002 500465,0 m: 1,10 g/cm³, waterbased960,0 m: 1,13 g/cm³, waterbased1 176,0 m: 1,12 g/cm³, waterbased1 404,0 m: 1,20 g/cm³, waterbased2 590,0 m: 1,23 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
32 395,0 - 2 415,019,0--266570 000
22 432,0 - 2 440,012,7--104234 000
12 797,0 - 2 807,016,7--238517 000
Show on the mapOpen on FactPages ↗