Fields / Sleipner Vest / 15/9-8
15/9-8
Exploration, appraisalPlugged and abandonedGas and condensate
Drilled by Den norske stats oljeselskap a.s with Nortrym in Sleipner Vest, 05.03.1981 to 25.05.1981 (81 days), to 3 730,0 m in the Smith Bank Formation.
Water depth103,0 m
Total depth3 730,0 m MD
Vertical depth3 729,0 m TVD
Bottom-hole temperature128 °C
Max inclination2,8°
Rotary table25,0 m
Formation at total depthSmith Bank Formation
RigNortrym
Spud05.03.1981
Completed25.05.1981
OperatorDen norske stats oljeselskap a.s
Position58,3822 N, 1,7745 E
Formations
35 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 128 °C |
| Drill-stem test at 3 460,0 m | 121 °C |
| Sleipner Vest gradient | 30,0 °C/km |
| Estimated at total depth from the gradient | 112 °C |
The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 179,0 | 36" | 179,0 | - |
| Surface casing | 20" | 481,0 | 26" | 495,0 | 1,65 LOT |
| Intermediate | 13 3/8" | 1 174,0 | 17 1/2" | 1 190,0 | 1,68 LOT |
| Intermediate | 9 5/8" | 2 831,0 | 12 1/4" | 2 840,0 | 1,82 LOT |
| Liner | 7" | 3 724,5 | 8 1/2" | 3 730,0 | - |
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 3 450,0 - 3 460,0 | 36,1 | - | 121 | 255 | 820 000 |