Fields / Sleipner Øst / 15/9-A-11
15/9-A-11
Development, productionClosedGas
Drilled by Statoil ASA (old) with Sleipner A in Sleipner Øst, 01.07.2002 to 10.08.2002 (40 days), to 3 098,0 m.
Water depth82,0 m
Total depth3 098,0 m MD
Vertical depth2 446,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud01.07.2002
Completed10.08.2002
OperatorStatoil ASA (old)
Position58,3674 N, 1,9083 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Øst gradient | 27,4 °C/km |
| Estimated at total depth from the gradient | 67 °C |
The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.