Fields / Sleipner Øst / 15/9-A-13
15/9-A-13
Development, observationPlugged
Drilled by StatoilHydro ASA with Sleipner A in Sleipner Øst, 14.11.2008 to 02.01.2009 (49 days), to 4 084,0 m.
Water depth82,0 m
Total depth4 084,0 m MD
Vertical depth2 561,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud14.11.2008
Completed02.01.2009
OperatorStatoilHydro ASA
Position58,3674 N, 1,9083 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Øst gradient | 27,4 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-A-13 A same well | 0,0 | 3 787,0 | - | - | 2009 |
| 15/9-A-14 | 0,0 | 7 030,0 | - | - | 2007 |
| 15/9-A-14 A | 0,0 | 9 661,0 | - | - | 2008 |
| 15/9-A-9 | 0,0 | 2 830,0 | - | - | 1994 |
| 15/9-A-10 | 0,0 | 2 648,0 | - | - | 1993 |
| 15/9-A-5 | 0,0 | 3 510,0 | - | - | 1994 |
| 15/9-A-15 | 0,0 | 4 333,0 | - | - | 1995 |
| 15/9-A-6 | 0,0 | 2 884,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.