15/9-A-19 A
Development, productionClosedGas and condensate
Drilled by Statoil ASA (old) with Sleipner A in Gungne, 13.06.2005 to 23.08.2005 (71 days), to 7 209,0 m.
Water depth82,0 m
Total depth7 209,0 m MD
Vertical depth3 155,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,0 m
Formation at total depth-
RigSleipner A
Spud13.06.2005
Completed23.08.2005
OperatorStatoil ASA (old)
Position58,3672 N, 1,9089 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Gungne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-A-19 same well | 0,0 | 4 852,0 | - | - | 1995 |
| 15/9-A-18 | 0,0 | 4 186,0 | - | - | 2007 |
| 15/9-A-23 | 0,0 | 5 590,0 | - | - | 1996 |
| 15/9-A-23 A | 0,0 | 5 600,0 | - | - | 2005 |
| 15/9-A-23 B | 0,0 | 4 670,0 | - | - | 2009 |
| 15/9-A-20 | 0,0 | 2 963,0 | - | - | 1995 |
| 15/9-A-22 | 0,0 | 3 626,0 | - | - | 1994 |
| 15/9-A-22 A | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.