WellplannerNorwegian shelf well data

Fields / Sleipner Øst / 15/9-C-2 H

15/9-C-2 H

Development, productionPluggedGas

Drilled by Den norske stats oljeselskap a.s with Treasure Prospec in Sleipner Øst, 13.10.1992 to 12.11.1992 (30 days), to 2 990,0 m.

Water depth84,0 m
Total depth2 990,0 m MD
Vertical depth2 526,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTreasure Prospec
Spud13.10.1992
Completed12.11.1992
OperatorDen norske stats oljeselskap a.s
Position58,4359 N, 1,9296 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Øst gradient27,4 °C/km
Estimated at total depth from the gradient70 °C

The gradient is the median of 5 released wells in Sleipner Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-C-2 AH same well0,03 254,0--1998
15/9-19 A0,04 131,0117 °C1,551997
15/9-19 B0,04 250,0119 °C1,551997
15/9-19 S0,03 580,0-1,501992
15/9-19 SR0,04 641,0--1993
15/9-19 SR20,04 644,0--1997
15/9-U-40,0138,9--1991
15/9-171,53 120,0108 °C1,351982

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗