15/9-F-1 C
Development, productionPlugged and abandonedOil
Drilled by Statoil Petroleum AS with Mærsk Inspirer in Volve, 21.02.2014 to 18.03.2014 (25 days), to 4 094,0 m.
Water depth91,0 m
Total depth4 094,0 m MD
Vertical depth3 181,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table54,9 m
Formation at total depth-
RigMærsk Inspirer
Spud21.02.2014
Completed18.03.2014
OperatorStatoil Petroleum AS
Position58,4416 N, 1,8874 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Volve report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-F-1 same well | 0,0 | 3 632,0 | - | - | 2013 |
| 15/9-F-1 A same well | 0,0 | 3 682,0 | - | - | 2013 |
| 15/9-F-1 B same well | 0,0 | 3 465,0 | - | - | 2013 |
| 15/9-F-7 | 0,0 | 1 085,0 | - | - | 2007 |
| 15/9-F-11 | 0,0 | 4 562,0 | - | - | 2013 |
| 15/9-F-11 A | 0,0 | 3 762,0 | - | - | 2013 |
| 15/9-F-11 B | 0,0 | 4 770,0 | - | - | 2013 |
| 15/9-F-12 | 0,0 | 3 520,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.