15/9-F-15 D
Development, productionPlugged and abandonedOil
Drilled by Statoil Petroleum AS with Mærsk Inspirer in Volve, 10.11.2013 to 07.12.2013 (27 days), to 4 685,0 m.
Water depth91,0 m
Total depth4 685,0 m MD
Vertical depth3 197,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table54,9 m
Formation at total depth-
RigMærsk Inspirer
Spud10.11.2013
Completed07.12.2013
OperatorStatoil Petroleum AS
Position58,4416 N, 1,8875 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Volve report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/9-F-15 same well | 0,0 | 4 105,0 | - | - | 2007 |
| 15/9-F-15 A same well | 0,0 | 4 095,0 | - | - | 2008 |
| 15/9-F-15 B same well | 0,0 | 3 497,0 | - | - | 2009 |
| 15/9-F-15 C same well | 0,0 | 3 232,0 | - | - | 2009 |
| 15/9-F-10 | 0,0 | 5 331,0 | - | - | 2009 |
| 15/9-F-10 A | 0,0 | - | - | - | - |
| 15/9-F-10 B | 0,0 | - | - | - | - |
| 15/9-F-14 | 0,0 | 3 750,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.