Fields / Edvard Grieg / 16/1-A-1
16/1-A-1
Development, injectionInjectingWater and gas
Drilled by Lundin Norway AS with Rowan Viking in Edvard Grieg, 10.07.2016 to 05.09.2016 (57 days), to 4 476,0 m.
Water depth109,0 m
Total depth4 476,0 m MD
Vertical depth2 326,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table72,2 m
Formation at total depth-
RigRowan Viking
Spud10.07.2016
Completed05.09.2016
OperatorLundin Norway AS
Position58,8428 N, 2,2482 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Edvard Grieg gradient | 42,2 °C/km |
| Estimated at total depth from the gradient | 94 °C |
The gradient is the median of 5 released wells in Edvard Grieg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-A-2 | 0,0 | 4 255,0 | - | - | 2015 |
| 16/1-A-5 | 0,0 | 4 808,0 | - | - | 2017 |
| 16/1-A-6 | 0,0 | 3 259,0 | - | - | 2015 |
| 16/1-A-9 | 0,0 | 6 702,0 | - | - | 2025 |
| 16/1-A-3 Y1 | 0,0 | 6 341,0 | - | - | 2023 |
| 16/1-A-3 Y2 | 0,0 | 4 953,0 | - | - | 2023 |
| 16/1-A-7 | 0,0 | 5 705,0 | - | - | 2017 |
| 16/1-A-10 | 0,0 | 2 490,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.