Fields / Ivar Aasen / 16/1-D-17 AY4
16/1-D-17 AY4
Development, productionProducingOil
Drilled by Aker BP ASA with Maersk Integrator in Ivar Aasen, 19.11.2020 to 29.11.2020 (10 days), to 5 605,0 m.
Water depth112,7 m
Total depth5 605,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table68,3 m
Formation at total depth-
RigMaersk Integrator
Spud19.11.2020
Completed29.11.2020
OperatorAker BP ASA
Position58,9222 N, 2,1981 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ivar Aasen gradient | 39,1 °C/km |
| Estimated at total depth from the gradient | 216 °C |
The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-D-17 same well | 0,0 | 3 169,0 | - | - | 2020 |
| 16/1-D-17 AY1 same well | 0,0 | 4 300,0 | - | - | 2020 |
| 16/1-D-17 AY2 same well | 0,0 | 5 113,0 | - | - | 2020 |
| 16/1-D-17 AY3 same well | 0,0 | 5 320,0 | - | - | 2020 |
| 16/1-D-17 B same well | 0,0 | - | - | - | - |
| 16/1-D-18 | 0,0 | 3 250,0 | - | - | 2019 |
| 16/1-D-18 A | 0,0 | 4 647,0 | - | - | 2019 |
| 16/1-D-13 | 0,0 | 4 385,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.