Fields / Ivar Aasen / 16/1-D-9 B
16/1-D-9 B
Development, productionPluggedOil
Drilled by Aker BP ASA with Maersk Interceptor in Ivar Aasen, 17.07.2017 to 22.07.2017 (5 days), to 6 290,0 m.
Water depth112,7 m
Total depth6 290,0 m MD
Vertical depth3 003,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigMaersk Interceptor
Spud17.07.2017
Completed22.07.2017
OperatorAker BP ASA
Position58,9223 N, 2,1981 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ivar Aasen gradient | 39,1 °C/km |
| Estimated at total depth from the gradient | 115 °C |
The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-26 A | 0,0 | 4 888,0 | - | 1,44 | 2016 |
| 16/1-26 S | 0,0 | 5 330,0 | - | 1,46 | 2016 |
| 16/1-D-9 same well | 0,0 | 5 571,0 | - | - | 2016 |
| 16/1-D-9 A same well | 0,0 | 7 077,0 | - | - | 2017 |
| 16/1-D-9 C same well | 0,0 | 4 312,0 | - | - | 2022 |
| 16/1-D-10 | 0,0 | 4 664,0 | - | - | 2015 |
| 16/1-D-5 | 0,0 | 4 077,0 | - | - | 2017 |
| 16/1-D-13 | 0,0 | 4 385,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.