Fields / 16/1-U-4
16/1-U-4
Other, soil drillingPlugged and abandoned
Drilled by Lundin Norway AS with Bucentaur, 10.06.2011 to 10.06.2011 (0 days), to 185,0 m.
Water depth109,0 m
Total depth185,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud10.06.2011
Completed10.06.2011
OperatorLundin Norway AS
Position58,8434 N, 2,2486 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-U-2 | 0,1 | 165,0 | - | - | 2011 |
| 16/1-A-4 | 0,1 | 4 530,0 | - | - | 2023 |
| 16/1-A-3 Y1 | 0,1 | 6 341,0 | - | - | 2023 |
| 16/1-A-3 Y2 | 0,1 | 4 953,0 | - | - | 2023 |
| 16/1-A-8 | 0,1 | 3 886,0 | - | - | 2018 |
| 16/1-A-8 A | 0,1 | 5 103,0 | - | - | 2018 |
| 16/1-A-2 | 0,1 | 4 255,0 | - | - | 2015 |
| 16/1-A-7 | 0,1 | 5 705,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.