Fields / Johan Sverdrup / 16/2-17 B
16/2-17 B
Exploration, appraisalPlugged and abandonedShows
Drilled by Statoil Petroleum AS with Ocean Vanguard in Johan Sverdrup, 20.05.2013 to 16.06.2013 (27 days), to 2 200,0 m in the Basement.
Water depth111,0 m
Total depth2 200,0 m MD
Vertical depth1 937,0 m TVD
Bottom-hole temperature-
Max inclination36,0°
Rotary table22,0 m
Formation at total depthBasement
RigOcean Vanguard
Spud20.05.2013
Completed16.06.2013
OperatorStatoil Petroleum AS
Position58,8044 N, 2,5295 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Johan Sverdrup gradient | 43,0 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 20 released wells in Johan Sverdrup with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 16/2-17 A same well | 0,0 | - | - | - | - |
| 16/2-17 S same well | 0,0 | 2 052,0 | 81 °C | 1,60 | 2013 |
| 16/2-U-17 | 0,0 | 409,0 | - | - | 2013 |
| 16/2-8 | 1,5 | 2 140,0 | 81 °C | 1,25 | 2011 |
| 16/2-11 | 2,5 | 2 126,0 | 87 °C | 1,35 | 2012 |
| 16/2-11 A | 2,5 | 2 365,0 | - | 1,37 | 2012 |
| 16/2-15 | 2,9 | 2 006,0 | 79 °C | 1,35 | 2012 |
| 16/2-D-4 | 3,8 | 4 160,0 | - | - | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Intermediate | 13 3/8" | 600,0 | - | - | - |
| Intermediate | 9 5/8" | 1 780,0 | 12 1/4" | 1 784,0 | - |
| Open hole | - | 2 200,0 | 8 1/2" | 2 200,0 | - |
Mud weight
7 measurements, one dot each, 1,20 to 1,45 g/cm³ against measured depth, xp-07 - yellow.