Fields / 16/2-U-2
16/2-U-2
Other, unknownPlugged and abandoned
Drilled by Statoil ASA (old) with Bucentaur, 18.09.2006 to 19.09.2006 (1 days), to 149,0 m.
Water depth113,9 m
Total depth149,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud18.09.2006
Completed19.09.2006
OperatorStatoil ASA (old)
Position58,8721 N, 2,3910 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.