Fields / 16/3-2
16/3-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Polyglomar Driller, 11.02.1976 to 08.03.1976 (26 days), to 2 019,0 m in the Basement.
Water depth118,0 m
Total depth2 019,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination1,2°
Rotary table24,0 m
Formation at total depthBasement
RigPolyglomar Driller
Spud11.02.1976
Completed08.03.1976
OperatorNorsk Hydro Produksjon AS
Position58,7869 N, 2,7930 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/3-1 | 0,0 | 453,0 | - | 1,10 | 1976 |
| 16/3-U-1 | 2,1 | 2 005,0 | 82 °C | 1,33 | 2016 |
| 16/3-U-1 A | 2,1 | 2 882,0 | - | 1,34 | 2016 |
| 16/3-U-1 B | 2,1 | 2 665,0 | - | 1,33 | 2017 |
| 16/3-U-2 | 2,6 | 466,0 | - | - | 2026 |
| 16/3-Q-1 H | 2,6 | 3 999,0 | - | - | 2023 |
| 16/3-Q-2 H | 2,6 | 2 700,0 | - | - | 2023 |
| 16/3-Q-4 H | 2,6 | 3 091,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 190,0 | 36" | 191,0 | - |
| Surface casing | 20" | 207,0 | 26" | 212,0 | - |
| Intermediate | 13 3/8" | 440,0 | 17 1/2" | 445,0 | - |
| Intermediate | 9 5/8" | 1 314,0 | 12 1/4" | 1 319,0 | - |
| Open hole | - | 2 019,0 | 8 1/2" | 2 019,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,28 g/cm³ against measured depth, sea water, waterbased.