Fields / 16/8-2
16/8-2
Exploration, wildcatPlugged and abandonedDry
Drilled by BP Norway Limited U.A. with Sedco H, 03.04.1980 to 13.08.1980 (132 days), to 3 585,0 m in the Zechstein Group.
Water depth72,5 m
Total depth3 585,0 m MD
Vertical depth3 583,0 m TVD
Bottom-hole temperature110 °C
Max inclination4,5°
Rotary table30,0 m
Formation at total depthZechstein Group
RigSedco H
Spud03.04.1980
Completed13.08.1980
OperatorBP Norway Limited U.A.
Position58,3499 N, 2,4165 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 110 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 145,0 | 36" | 152,0 | - |
| Surface casing | 18 5/8" | 504,0 | 24" | 511,0 | 1,96 LOT |
| Intermediate | 13 3/8" | 1 666,0 | 17 1/2" | 1 675,0 | 1,85 LOT |
| Intermediate | 9 5/8" | 2 245,0 | 12 1/4" | 2 258,0 | 2,00 LOT |
| Liner | 7" | 3 585,0 | 8 1/2" | 3 585,0 | - |
Mud weight
9 measurements, one dot each, 1,10 to 1,89 g/cm³ against measured depth, water.