Fields / 16/9-1
16/9-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Esso Exploration and Production Norway A/S with Glomar Grand Isle, 08.05.1968 to 12.07.1968 (65 days), to 3 655,0 m in the Zechstein Group.
Water depth89,0 m
Total depth3 655,0 m MD
Vertical depth3 655,0 m TVD
Bottom-hole temperature101 °C
Max inclination-
Rotary table9,0 m
Formation at total depthZechstein Group
RigGlomar Grand Isle
Spud08.05.1968
Completed12.07.1968
OperatorEsso Exploration and Production Norway A/S
Position58,3782 N, 2,8047 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 101 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 127,0 | 36" | 131,0 | - |
| Intermediate | 20" | 336,0 | 26" | 358,0 | - |
| Intermediate | 13 3/8" | 1 405,0 | 17 1/2" | 1 418,0 | - |
| Open hole | - | 3 655,0 | 12 1/4" | 3 655,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,34 g/cm³ against measured depth, seawater.