Fields / 17/12-1
17/12-1
Exploration, wildcatSuspendedDry
Drilled by Phillips Petroleum Company Norway with Mærsk Explorer, 27.10.1971 to 01.11.1971 (5 days), to 458,0 m in the Hordaland Group.
Water depth115,0 m
Total depth458,0 m MD
Vertical depth458,0 m TVD
Bottom-hole temperature-
Max inclination3,0°
Rotary table27,0 m
Formation at total depthHordaland Group
RigMærsk Explorer
Spud27.10.1971
Completed01.11.1971
OperatorPhillips Petroleum Company Norway
Position58,1881 N, 3,9395 E
Formations
2 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 17/12-1 R same well | 0,0 | 4 298,0 | 101 °C | 1,61 | 1972 |
| 17/12-U-15 | 0,2 | - | - | - | - |
| 17/12-U-22 | 0,6 | - | - | - | - |
| 17/12-U-21 | 0,7 | - | - | - | - |
| 17/12-U-20 | 1,3 | - | - | - | - |
| 17/12-U-4 | 1,3 | - | - | - | - |
| 17/12-U-16 | 1,5 | - | - | - | - |
| 17/12-U-23 | 1,7 | - | - | - | - |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 178,0 | 36" | 178,0 | - |
| Intermediate | 20" | 458,0 | 26" | 458,0 | - |
Mud weight
2 measurements, one dot each, 1,00 to 1,13 g/cm³ against measured depth, seawater.