Fields / 18/11-1
18/11-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Elf Petroleum Norge AS with Deepsea Driller, 17.02.1974 to 31.03.1974 (42 days), to 2 086,0 m in the Basement.
Water depth116,0 m
Total depth2 086,0 m MD
Vertical depth-
Bottom-hole temperature50 °C
Max inclination-
Rotary table25,0 m
Formation at total depthBasement
RigDeepsea Driller
Spud17.02.1974
Completed31.03.1974
OperatorElf Petroleum Norge AS
Position58,0726 N, 4,5334 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 50 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 177,0 | 36" | 177,0 | - |
| Surface casing | 20" | 373,0 | 26" | 386,0 | - |
| Intermediate | 13 3/8" | 805,0 | 17 1/2" | 823,0 | - |
| Intermediate | 9 5/8" | 1 805,0 | 12 1/4" | 1 815,0 | - |
| Open hole | - | 2 086,0 | 8 1/2" | 2 086,0 | - |
Mud weight
4 measurements, one dot each, 1,20 to 1,32 g/cm³ against measured depth, waterbased.