WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-9 A

2/1-A-9 A

Development, injectionPlugged and abandonedWater

Drilled by Talisman Energy Norge AS with Gyda in Gyda, 29.09.2007 to 12.10.2007 (13 days), to 4 202,0 m.

Water depth65,5 m
Total depth4 202,0 m MD
Vertical depth4 105,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud29.09.2007
Completed12.10.2007
OperatorTalisman Energy Norge AS
Position56,9048 N, 3,0852 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient152 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-140,04 130,0--1992
2/1-A-14 A0,04 747,0--1996
2/1-A-14 B0,05 444,0--2002
2/1-A-14 C0,05 631,0--2007
2/1-A-9 same well0,04 187,0--1991
2/1-A-180,04 622,0--1993
2/1-A-150,04 360,0--1992
2/1-A-100,07 273,0--2008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗