Fields / 2/11-U-14
2/11-U-14
Other, soil drillingPlugged and abandoned
Drilled by BP Norge AS with Bucentaur, 06.06.2012 to 07.06.2012 (1 days), to 113,5 m.
Water depth72,0 m
Total depth113,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud06.06.2012
Completed07.06.2012
OperatorBP Norge AS
Position56,1935 N, 3,4682 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.