Fields / 2/12-2 S
2/12-2 S
Exploration, appraisalPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander, 15.02.1990 to 14.09.1990 (211 days), to 5 757,0 m in the Smith Bank Formation.
Water depth70,0 m
Total depth5 757,0 m MD
Vertical depth5 337,4 m TVD
Bottom-hole temperature162 °C
Max inclination31,3°
Rotary table22,0 m
Formation at total depthSmith Bank Formation
RigMærsk Jutlander
Spud15.02.1990
Completed14.09.1990
OperatorNorsk Hydro Produksjon AS
Position56,2317 N, 3,7046 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 162 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/12-1 | 0,4 | 4 795,0 | 151 °C | 2,25 | 1986 |
| 2/11-7 | 4,8 | 5 042,0 | 178 °C | 2,14 | 1986 |
| 2/9-U-2 | 8,1 | 105,0 | - | - | 2007 |
| 2/9-U-1 | 8,2 | 110,0 | - | - | 2007 |
| 2/9-U-3 | 8,2 | 105,0 | - | - | 2007 |
| 2/9-4 | 8,2 | 5 500,0 | 158 °C | 2,12 | 2008 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 177,0 | 36" | 180,0 | - |
| Intermediate | 20" | 1 295,0 | 26" | 1 300,0 | 1,76 LOT |
| Intermediate | 13 3/8" | 2 751,0 | 17 1/2" | 2 755,0 | 1,94 LOT |
| Intermediate | 9 5/8" | 4 305,0 | 12 1/4" | 4 310,0 | 2,17 LOT |
| Liner | 7" | 5 008,0 | 8 1/2" | 5 757,0 | 2,25 LOT |
Mud weight
191 measurements, one dot each, 1,00 to 2,08 g/cm³ against measured depth, dummy, water based.