Fields / 2/3-4
2/3-4
Exploration, wildcatPlugged and abandonedDry
Drilled by Norwegian Gulf Exploration Company AS with Glomar Moray F.i, 28.05.1984 to 24.07.1984 (57 days), to 3 386,0 m in the Zechstein Group.
Water depth56,0 m
Total depth3 386,0 m MD
Vertical depth3 386,0 m TVD
Bottom-hole temperature109 °C
Max inclination-
Rotary table38,0 m
Formation at total depthZechstein Group
RigGlomar Moray F.i
Spud28.05.1984
Completed24.07.1984
OperatorNorwegian Gulf Exploration Company AS
Position56,7793 N, 3,8077 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 109 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/6-U-19 | 5,2 | - | - | - | - |
| 2/6-U-17 | 5,3 | - | - | - | - |
| 2/6-U-18 | 5,4 | - | - | - | - |
| 2/6-U-15 | 5,8 | - | - | - | - |
| 2/6-U-16 | 5,8 | - | - | - | - |
| 2/6-U-13 | 5,8 | - | - | - | - |
| 2/6-7 A | 5,8 | 3 444,0 | - | - | 2024 |
| 2/6-7 S | 5,8 | 3 763,0 | 137 °C | 1,57 | 2024 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 183,5 | 36" | 335,3 | - |
| Surface casing | 20" | 644,5 | 26" | 650,5 | 1,49 LOT |
| Intermediate | 13 3/8" | 1 770,6 | 17 1/2" | 1 786,0 | 1,74 LOT |
| Intermediate | 9 5/8" | 2 963,9 | 12 1/4" | 2 967,8 | 1,92 LOT |
| Open hole | - | 3 386,0 | 8 1/2" | 3 386,0 | - |
Mud weight
15 measurements, one dot each, 1,00 to 1,56 g/cm³ against measured depth, oil based, water based.