2/4-B-14
Development, productionPlugged and abandonedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 05.01.1975 to 03.02.1975 (29 days), to 3 406,4 m.
Water depth71,0 m
Total depth3 406,4 m MD
Vertical depth3 301,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud05.01.1975
Completed03.02.1975
OperatorPhillips Petroleum Company Norway
Position56,5652 N, 3,2037 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-B-13 | 0,0 | 3 697,0 | - | - | 1991 |
| 2/4-B-13 A | 0,0 | 3 655,0 | - | - | 2005 |
| 2/4-B-13 B | 0,0 | 3 600,0 | - | - | 2005 |
| 2/4-B-15 | 0,0 | 4 213,6 | - | - | 1974 |
| 2/4-B-15 A | 0,0 | 3 476,0 | - | - | 1989 |
| 2/4-B-6 | 0,0 | 4 049,0 | - | - | 1975 |
| 2/4-B-6 A | 0,0 | 3 904,5 | - | - | 1989 |
| 2/4-B-22 | 0,0 | 3 425,0 | - | - | 1974 |
Casing and formation tests
No casing programme is reported for this wellbore.