2/4-B-19 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 09.03.1985 to 21.04.1985 (43 days), to 3 349,4 m.
Water depth71,0 m
Total depth3 349,4 m MD
Vertical depth3 328,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud09.03.1985
Completed21.04.1985
OperatorPhillips Petroleum Company Norway
Position56,5653 N, 3,2038 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-19 B | 0,0 | 4 605,0 | 110 °C | - | 1975 |
| 2/4-B-19 same well | 0,0 | 3 349,0 | - | - | 1975 |
| 2/4-B-19 B same well | 0,0 | 3 636,0 | - | - | 2004 |
| 2/4-B-19 C same well | 0,0 | 4 648,0 | - | - | 2012 |
| 2/4-B-11 | 0,0 | 4 927,0 | - | - | 2002 |
| 2/4-B-20 | 0,0 | 4 087,4 | - | - | 1980 |
| 2/4-B-20 A | 0,0 | 3 881,0 | - | - | 1987 |
| 2/4-B-20 B | 0,0 | 3 435,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.