2/4-B-21 A
Development, productionPlugged and abandonedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 30.11.1993 to 02.01.1994 (33 days), to 3 591,0 m.
Water depth71,0 m
Total depth3 591,0 m MD
Vertical depth3 326,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud30.11.1993
Completed02.01.1994
OperatorPhillips Petroleum Company Norway
Position56,5653 N, 3,2037 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-B-21 same well | 0,0 | 3 722,8 | - | - | 1975 |
| 2/4-B-21 B same well | 0,0 | 4 011,0 | - | - | 2005 |
| 2/4-B-20 | 0,0 | 4 087,4 | - | - | 1980 |
| 2/4-B-20 A | 0,0 | 3 881,0 | - | - | 1987 |
| 2/4-B-20 B | 0,0 | 3 435,0 | - | - | 2004 |
| 2/4-B-22 | 0,0 | 3 425,0 | - | - | 1974 |
| 2/4-B-22 A | 0,0 | 3 523,0 | - | - | 1994 |
| 2/4-B-13 | 0,0 | 3 697,0 | - | - | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.