2/4-B-8 A
Development, productionClosedOil
Drilled by ConocoPhillips Skandinavia AS with Mærsk Gallant in Ekofisk, 02.06.2007 to 26.08.2007 (85 days), to 5 621,0 m.
Water depth74,0 m
Total depth5 621,0 m MD
Vertical depth3 251,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Gallant
Spud02.06.2007
Completed26.08.2007
OperatorConocoPhillips Skandinavia AS
Position56,5652 N, 3,2036 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 123 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-B-8 same well | 0,0 | 3 353,0 | - | - | 1979 |
| 2/4-B-7 | 0,0 | 3 928,6 | - | - | 1974 |
| 2/4-B-7 A | 0,0 | 5 018,0 | - | - | 2013 |
| 2/4-B-16 | 0,0 | 3 307,0 | - | - | 1980 |
| 2/4-B-16 A | 0,0 | 3 180,6 | - | - | 1986 |
| 2/4-B-16 B | 0,0 | 3 338,0 | - | - | 1991 |
| 2/4-B-16 C | 0,0 | 3 562,0 | - | - | 1991 |
| 2/4-B-16 D | 0,0 | 3 969,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.