2/4-C-12 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk C in Ekofisk, 16.01.1994 to 27.02.1994 (42 days), to 3 479,0 m.
Water depth73,0 m
Total depth3 479,0 m MD
Vertical depth3 252,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigEkofisk C
Spud16.01.1994
Completed27.02.1994
OperatorPhillips Petroleum Company Norway
Position56,5480 N, 3,2155 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 124 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-C-12 same well | 0,0 | 3 431,1 | - | - | 1975 |
| 2/4-C-21 | 0,0 | 3 781,0 | - | - | 1992 |
| 2/4-C-20 | 0,0 | 3 520,0 | - | - | 1992 |
| 2/4-C-11 | 0,0 | 3 355,0 | - | - | 1986 |
| 2/4-C-11 A | 0,0 | 3 360,0 | - | - | 1994 |
| 2/4-C-13 | 0,0 | 3 771,9 | - | - | 1974 |
| 2/4-C-13 A | 0,0 | 3 511,0 | - | - | 1993 |
| 2/4-C-7 | 0,0 | 3 666,1 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.