2/4-C-23
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk C in Ekofisk, 20.05.1991 to 24.06.1991 (35 days), to 3 536,0 m.
Water depth73,0 m
Total depth3 536,0 m MD
Vertical depth3 322,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigEkofisk C
Spud20.05.1991
Completed24.06.1991
OperatorPhillips Petroleum Company Norway
Position56,5480 N, 3,2156 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-C-14 | 0,0 | 3 575,9 | - | - | 1975 |
| 2/4-C-14 A | 0,0 | 3 609,0 | - | - | 1992 |
| 2/4-C-10 | 0,0 | 4 191,3 | - | - | 1975 |
| 2/4-C-9 | 0,0 | 3 574,1 | - | - | 1974 |
| 2/4-C-9 A | 0,0 | 3 373,0 | - | - | 1994 |
| 2/4-C-15 | 0,0 | 4 037,1 | - | - | 1975 |
| 2/4-C-15 A | 0,0 | 3 942,9 | - | - | 1988 |
| 2/4-C-19 | 0,0 | 3 837,4 | - | - | 1989 |
Casing and formation tests
No casing programme is reported for this wellbore.